this post was submitted on 22 Nov 2024
246 points (89.7% liked)

World News

39142 readers
2753 users here now

A community for discussing events around the World

Rules:

Similarly, if you see posts along these lines, do not engage. Report them, block them, and live a happier life than they do. We see too many slapfights that boil down to "Mom! He's bugging me!" and "I'm not touching you!" Going forward, slapfights will result in removed comments and temp bans to cool off.

We ask that the users report any comment or post that violate the rules, to use critical thinking when reading, posting or commenting. Users that post off-topic spam, advocate violence, have multiple comments or posts removed, weaponize reports or violate the code of conduct will be banned.

All posts and comments will be reviewed on a case-by-case basis. This means that some content that violates the rules may be allowed, while other content that does not violate the rules may be removed. The moderators retain the right to remove any content and ban users.


Lemmy World Partners

News !news@lemmy.world

Politics !politics@lemmy.world

World Politics !globalpolitics@lemmy.world


Recommendations

For Firefox users, there is media bias / propaganda / fact check plugin.

https://addons.mozilla.org/en-US/firefox/addon/media-bias-fact-check/

founded 1 year ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] maevyn@lemmy.blahaj.zone 1 points 2 days ago

Hmm, I think of baseload as the following:

  • Hospitals and emergency services
  • Data centers and communications
  • 24 hour transit needs
  • 24 hour lighting in cities
  • Ventilation, heating/cooling for certain climates

Some of these can be mitigated significantly, but some of these are just things that really can never be down and have to have like 99.999% reliability. As we electrify, I’m going to be looking at storage solutions for these things and seeing if we really feel confident in that up time and having extra reserves. Engineers usually over design, so if we expect to need like 0.1 gigawatts for a week for emergency services during an abnormal weather event, I would want to plan for 1 gigawatt for two weeks for instance.

If that can be done with storage, then that’s awesome, and once we start seeing that roll out widely I will stop advocating for the “do both” strategy.