this post was submitted on 05 Mar 2024
105 points (71.6% liked)

Unpopular Opinion

6317 readers
73 users here now

Welcome to the Unpopular Opinion community!


How voting works:

Vote the opposite of the norm.


If you agree that the opinion is unpopular give it an arrow up. If it's something that's widely accepted, give it an arrow down.



Guidelines:

Tag your post, if possible (not required)


  • If your post is a "General" unpopular opinion, start the subject with [GENERAL].
  • If it is a Lemmy-specific unpopular opinion, start it with [LEMMY].


Rules:

1. NO POLITICS


Politics is everywhere. Let's make this about [general] and [lemmy] - specific topics, and keep politics out of it.


2. Be civil.


Disagreements happen, but that doesn’t provide the right to personally attack others. No racism/sexism/bigotry. Please also refrain from gatekeeping others' opinions.


3. No bots, spam or self-promotion.


Only approved bots, which follow the guidelines for bots set by the instance, are allowed.


4. Shitposts and memes are allowed but...


Only until they prove to be a problem. They can and will be removed at moderator discretion.


5. No trolling.


This shouldn't need an explanation. If your post or comment is made just to get a rise with no real value, it will be removed. You do this too often, you will get a vacation to touch grass, away from this community for 1 or more days. Repeat offenses will result in a perma-ban.



Instance-wide rules always apply. https://legal.lemmy.world/tos/

founded 1 year ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] IchNichtenLichten@lemmy.world -5 points 8 months ago (1 children)

This is not correct.

It is, you just proved it yourself:

"typical ramps are kept below 1.5%/min."

Compare that with batteries or pumped hydro.

[–] NaibofTabr@infosec.pub 9 points 8 months ago* (last edited 8 months ago) (1 children)

That's plenty fast enough for a power grid.

1.5% of 900MW is 13.5MW. That's plenty of power output scaling per minute.

[–] IchNichtenLichten@lemmy.world -4 points 8 months ago* (last edited 8 months ago) (1 children)

I think you're getting peaker plants, e.g gas fired confused with load following.

Nuclear plants are not used as peaker plants. you incorrectly stated that they are.

[–] maxmalrichtig@discuss.tchncs.de 1 points 8 months ago* (last edited 8 months ago)

It's a shame that you're being voted down here, even though your points are actually more on the factual side. Well, that's probably the fate of those who "dare" to say something against nuclear. Even if everyone else demonstrably doesn't have a clue about the subject: They're still bashing it. It's just good that downvotes on Lemmy don't really matter.