136

This wall was to the supply room with all of the uniforms and PPE. The building was constructed in the mid-20th century so it turns out it's full of asbestos. Thanks mole man.

(page 2) 28 comments
sorted by: hot top controversial new old
[-] tripartitegraph@hexbear.net 11 points 4 months ago

On three separate occasions this past school year, some contractors were removing asbestos from one of the labs in the basement. The only notice was a paper sign posted very inconspicuously on two of the building doors, the day removal started.
They did some sealing on the hallway that room was in, but otherwise no precautions were taken. My office was two hallways down, and all classes in the building ran like normal. Very safe, very good blob-no-thoughts

[-] InevitableSwing@hexbear.net 11 points 4 months ago

That's a great photo. I also like how the yellow tape is made by Body Guard

[-] pastalicious@hexbear.net 11 points 4 months ago

I see we have a resident asbestos expert. A few years ago I was responsible for removing some equipment that was mounted to the drop ceiling before they demolished a room to renovate. A few days after my part while they were mid demo the asbestos remediation signs showed up and big tubes were strung through the hallways. I didn’t work in that building so I’m not worried about what was disturbed by demo and spread around but have to wonder how much exposure I got being in the plenum space for about fifteen minutes.

[-] Grandpa_garbagio@hexbear.net 10 points 4 months ago
load more comments
view more: ‹ prev next ›
this post was submitted on 09 Jun 2024
136 points (100.0% liked)

chapotraphouse

13484 readers
902 users here now

Banned? DM Wmill to appeal.

No anti-nautilism posts. See: Eco-fascism Primer

Vaush posts go in the_dunk_tank

Dunk posts in general go in the_dunk_tank, not here

Don't post low-hanging fruit here after it gets removed from the_dunk_tank

founded 3 years ago
MODERATORS